ISRAEL
2026
BUILT
A wind turbine that doesn’t spin.
It swings.
3D SYSTEM
MOTION
INVESTOR VALUES
Nothing drawn to scale
Six days to the first room
The geometry is his
It had to be seen to be discussed
Four steps, six days — the crude version went first, on purpose,while changing it was still cheap. He replied the same night: “I see and it is basicly very good.”
Phase one
01 The two rules the machine runs on
02 Then put it somewhere

Phase TWO
03 The correction — the blade was not the thing that moved

04 The platform — changed completely, seven minutes after it was specified

Masts per platform
Four · 80, 110, 140, 170 m
Platforms
Seven
Spacing
280 m apart
Clearance
140 m between blade tips
Cycle
10 s — 4 swing, 1 reversal, 4 back, 1 to turn
Arcs
70°, 60°, 55°, 50° front to back
Chanan Herbet










